Bore pile foundation close heritage building should be no damage. Install the bore pile process had to perfect, nonporous concrete, no necking, no sliding soil, no mixed deep water, Objective the construction of bore pile near heritage buildings did not deformation and no crack. The case study methodology was surveying the process of the installation bore pile at the soft soil. Analyzing the results of the loading test, the process of installing bore piles with limited space, without damaging heritage buildings. Monitoring will determine the success of the bore pile structure, including a slight decrease in the water table in the area and outside the building site. The vibration drill equipment damped by the trench so that it was safe from cracks in the heirloom building. Monitor the mud content in the water that went out at bore done of soil, monitor concrete every 2 m depth of bore pile the volume of concrete the heirloom building was not damaged. Axial bore pile test, lateral test according to design.