1. Introduction
Historically,
The purpose of a
A significant objective of HCA studies is to analyze highway-related costs attributable to different highway users as a basis for evaluating the equity and efficiency of user charges. Ideally, the costs incurred by the various user groups should be in proportion to the damage they contribute to the highway system. The cost of supporting a highway infrastructure may be deemed fair if there is an equitable distribution of costs and revenues among the various groups of highway users. With this assumption, equity is achieved when each group’s percentage of total assigned costs is equal to the percentage of the revenues contributed by that group. This chapter focuses exclusively on highway cost allocation, specifically the allocation of pavement and bridge costs.
Highway users are concerned about the fairness of road-use charges and demand that these be allocated equitably among the various vehicle classes occasioning the total cost. Although the word
Costs associated with highway construction, maintenance, and operation can be divided into several categories. Because the impact of different vehicle classes on the costs is different, each of the cost categories should be allocated among the various user groups or vehicle classes in a different manner. These cost categories are:
Costs associated with new pavement construction.
Costs associated with pavement maintenance, rehabilitation, and reconstruction.
Costs associated with new bridge construction.
Costs associated with bridge maintenance, rehabilitation, and reconstruction.
Costs associated with system enhancement.
Other highway-related costs.
In addition to this Introduction, this chapter is organized according to six additional sections. Section 2 briefly describes several traditional and non-traditional procedures for highway cost allocation and outlines some important properties of game-theory-based procedures. Section 3 presents a conceptual framework for conducting a highway cost allocation study for a transportation agency, such as a U.S. state Department of Transportation. Section 4 discusses the application of the
2. Highway cost allocation procedures and properties
2.1. Traditional HCA Methods
During the last three decades, several methods have been developed for the purpose of allocating the total cost of a transportation facility among all the vehicle classes using it. Most procedures that can be used to achieve this goal can be grouped as either
2.2. Non-traditional HCA methods
Several non-traditional allocation methods have been developed based on concepts from the theory of cooperative games by Neumann and Morgenstern [7].
The application of
The
The
where |S| and |N| represent the cardinality of sets
The
2.3. Desirable HCA properties
In order to explain some desirable properties of Highway Cost Allocation (HCA) procedures we will consider a highway facility such as a pavement or a bridge. First, completeness is the property that highway costs (construction, rehabilitation, maintenance) are fully paid for by all participating vehicle classes. Second, rationality is the property that each vehicle class is guaranteed a lower cost by participating in the
3. Overview of a highway cost allocation study
Figure 1 outlines a typical framework of a highway cost allocation study for a transportation agency, such as a State Department of Transportation. Instead of directly allocating a total cost at the state level, a more equitable approach is to divide the total cost on the basis of three
For any
3.1. Vehicle classes
Vehicle classes are viewed as players in a cooperative game. The object of a highway cost location procedure is to fairly divide the construction, rehabilitation or maintenance cost of a transportation facility, such as a highway or a bridge, among these users or players. The following vehicle classes are typically included in highway cost allocation studies:
Motorcycles
Passenger cars
Other Two-Axle, Four-Tire Single Unit Vehicles
Buses
Two-Axle, Six-Tire, Single-Unit Trucks
Three-Axle Single-Unit Trucks
Four or More Axle Single-Unit Trucks
Four or Fewer Axle Single-Trailer Trucks
Five-Axle Single-Trailer Trucks
Six or More Axle Single-Trailer Trucks
Five or fewer Axle Multi-Trailer Trucks
Six-Axle Multi-Trailer Trucks
Seven or More Axle Multi-Trailer Trucks
3.2. Database description
The database includes the information of traffic levels and costs of relevant pavement maintenance or rehabilitation projects for different data classifications. Typically the database has data for all classifications formed with the following attributes:
Climactic Regions. Since the performance of a pavement is affected by climatic conditions, it is customary to divide a large geographic area into smaller homogeneous climatic regions.
Highway Systems. In a number of studies two to three highway systems are included when defining the scope of the study. In a number of U.S. states at least Interstate Highways, US highways, and State highways/roads are included.
Highway Locations. There are two primary types of locations considered in a number of studies: urban and rural areas.
For each of the resulting classifications or combinations of climactic region, highway system, and location, at least three (or four) projects are extracted from the database and used to estimate cost relationships (characteristic functions) that can be used to estimate costs for different levels of ESALs. Typically traffic data available will include the following:
Annual Average Daily Traffic (AADT) and Equivalent Single-Axle Loads (ESALs).
The distribution of vehicles on the road (proportion of passenger cars, single-axle trucks, etc.)
In order to generate data for a more detailed level of classification, the following information can be used:
Vehicle Miles Traveled (VMT)
Required number of lanes for various combinations of vehicle classes
Since each treated or constructed pavement has a specific service life and all the vehicles traveled in its service life should pay the maintenance or construction cost, the Equivalent Annual Cost (EAC) of the project in its service life is calculated and used as the cost of that specific project. EAC is the cost per year of owning and operating an asset over its entire lifespan. This cost is calculated for the following highway work activities:
Pavement maintenance: typically both routine and preventive maintenance activities are included in this cost component. Routine maintenance activities are needed to repair cracks of different types, fill pot holes and correct other signs of pavement distress. Preventive maintenance is done mostly applying thin seal coats, micro surfacing, fog sealing, chip sealing, etc.
Pavement rehabilitation: pavement rehabilitation activities include conventional hot mixed asphalt overlay with or without milling. Generally, thicker overlays will be used for high traffic level roads and thus the cost will be also higher.
Pavement construction: new pavement construction includes the subgrade, base layer and surface layer.
4. Generalized method
Let N be the set (grand coalition) of all vehicle classes using a highway. Let C(N) be the cost per mile of this highway (construction, rehabilitation or maintenance). Furthermore, let Ri the cost paid by vehicle class iN. The completeness property can be formulated as
Now, let us consider a subset (coalition) of vehicle classes, SN, and let C(S) be the cost per mile of a highway designed specifically to accommodate only the vehicle classes in S. The rationality property can be formulated as
Furthermore, the marginality property implies that
It can be proved that if the completeness property (2) is held then the rationality and marginality properties (3) and (4) are equivalent. From (3) it is concluded that the savings enjoyed by a coalition S when joining the grand coalition are given by
To maximize these savings, we maximize t, where
which can be rewritten as
As an illustration, for N = {1,2,3}, the LP model for the Generalized Method is formulated in (7)-(15).
Subject to
Constraints (8)-(10) correspond to highways (pavements) designed to accommodate single-vehicle-class coalitions. Constraints (11)-(13) correspond to two-vehicle-class coalitions. Constraint (14) corresponds to the grand coalition. Each coalition has a level of traffic loadings, measured in ESALs, for a specified design period (typically 20 years). The highway cost per mile should be strictly increasing as the number of ESALs increases. Under this assumption, Constraints (8)-(14) define a feasible region called the core of the game when t=0. If W1 and W2 are measured in ESALS then the core exists if C1, C2, C3, C12, C13, C23 and C123 satisfy the following condition
It can be proved that a typical non-decreasing cost function satisfying (16) is the one represented in Figure 2. In this figure, W is the total number of standard loads (ESALs) for the grand coalition and C(W) is the cost to be allocated. In a number of highway cost allocation studies functions like the one shown in this figure are found using regression analysis from cost data for a set of highway projects available in the database of the study.
Figure 3(a) shows the feasible region for the above formulation when t = 0. Figure 3(b) shows the effect of increasing the value of the variable t. It is noted in this figure that as the value of t increases, the feasible region gets smaller, becoming either a point or a line when t reaches its maximum value. A solution represented by one point indicates a unique solution. The line represents infinitely many optimal solutions, a case already indicated in Section 2.
When the model formulated in (7)-(15) has infinitely many optimal solutions an additional condition must be considered to select a unique solution. The solution procedure can, therefore, be divided into two phases, with the second one needed only to break the tie among multiple solutions in the first phase.
4.1. Phase 1 of generalized method
Subject to
4.2. Phase 2 of generalized method
Villarreal-Cavazos and Garcia-Diaz [13] proposed to break the tie among multiple solutions using the concept of statistical cost effect of vehicle classes. This is defined as the difference in average cost between all coalitions including a given vehicle class and all coalitions not including the class. If Ei is the cost effect of vehicle class i, the relative effect is defined as
Also, the relative cost allocated to vehicle class i is defined as
A unique solution is obtained from the solution to the non-linear model formulated in (21)-(24).
Minimize
Subject to
where t* is the optimal value obtained for t in Phase 1. The model formulated in (21)-(24) can be linearized as shown in (25)-(30).
Minimize
Subject to
It is noted that by LP optimality conditions,
4.3. Statistical cost effects
A grand coalition consisting of the set of vehicle classes {1,2,3} is considered again to illustrate the calculation of the relative cost effects of the classes. First we regard each vehicle class as a two-level factor. The levels can be represented by the signs – and +, where – means that the vehicle class is not in a coalition and + indicates that it is in the coalition. Moreover, the number of level combinations for three two-level factors is equal to 23 = 8. These eight combinations are listed in Table 1. Now, it is noted that combinations 2-8 represent the 7 coalitions that can be formed with the three vehicle classes being considered. The last column in the table shows the highway cost for each coalition. Combination 1 corresponds to an empty coalition. Its cost can be viewed as the environmental cost, that is, the cost needed to have a facility able to withstand the impact of climatic conditions alone, not considering the impact of vehicle loadings. In HCA studies this cost can be regarded as a specified fraction of C123.
Combination | X1 | X2 | X3 | Cost |
1 | - | - | - | Co |
2 | + | - | - | C1 |
3 | - | + | - | C2 |
4 | + | + | - | C12 |
5 | - | - | + | C3 |
6 | + | - | + | C13 |
7 | - | + | + | C23 |
8 | + | + | + | C123 |
The effect of factor Xi, for example, as previously indicated, is the difference in average cost between the coalitions including vehicle class i and those not including it. Based on this definition, the cost effects of the three vehicle classes are obtained as follows using the results shown in Table 1:
Once E1, E2, …, En are calculated their values are used to define the relative cost effects
and we can formulate the tie-breaking constraints (26) needed in the second phase of the generalized method.
5. Separation of pavement thickness and traffic capacity costs
The proposed approach [12] distributes traffic-related costs in a more fair way than any other method by considering both traffic loads and traffic capacity. Furthermore, the development of a new cost allocation methodology considering allows us to analyze the impact of traffic capacity costs. The two concepts used in the proposed methodology to allocate costs among vehicle classes, according to traffic load and capacity requirements, are known as the Shapley value and the Aumann-Shapley value. In essence the Aumann-Shapley value determines an average cost per ESAL and an average cost per lane (per mile). The Shapley value allocates the total number of lanes of a highway among the vehicle classes. With these results, it is then possible to calculate costs per mile for each vehicle class by adding the cost due to ESALs (pavement thickness) and the cost due to lanes (capacity).
Two types of players will be considered. E = {1,2,…,q1} and L = {1,2,…,q2} are sets of players of type 1 and type 2, respectively. Thus, M = E L is the set of all players. Now, let P(M) be the set of all subsets or coalitions formed with the elements of M. Furthermore, let N be the set of natural numbers and R+ be the set of positive real numbers. Let C: P(M) R+ be a real-valued cost function known as the characteristic function. Finally, let x(q1,q2;C) be allocated costs yielded by a cost allocation method, x1(q1,q2;C) be the cost allocated to player 1 and x2(q1,q2;C) be the allocated cost to player 2. With these conventions, four important definitions are given below.
5.1. Definitions
If x1(q1,q2;C) + x2(q1,q2;C) = C(M), then the method x is called complete.
If x(q1,q2;C1+C2 ) = x(q1,q2;C1) + x(q1,q2;C2 ), where C1 and C2 are non-decreasing cost functions, then the method x is called additive. If a cost function can be divided into two distinct and independent cost components, then the allocated costs can be divided into two corresponding components.
If C(S) – C(S\{i}) = 0 for any i S, i N, and S N, then xi(q1,q2;C) = 0. In this case, the method x is called dummy. If any player does not contribute to any coalition, then the cost allocated to it is zero.
If x1(q1,q2;C) ≥ x1(q1-1,q2;C), then the cost allocation method x is called demand monotonic for any q1>2. Similarly, if x2(q1,q2;C) ≥ x2(q1,q2-1;C), then the cost allocation method x is called demand monotonic for any q2>2. The cost-share of a player should not decrease when the player increases its demand.
Friedman [13] shows that the A-S value is complete, additive, and dummy. In addition, Friedman and Moulin [14] show that the A-S value does not satisfy the demand monotonicity property for general non-decreasing cost functions. Lee & Garcia-Diaz [15] show that demand monotonicity will be held in the following cases.
5.2. Pavement and capacity costs allocation
Assume the log concave cost function formulated in (33):
where e is the number of ESALs, l N is the number of lanes, C(e,l) is the cost in dollars per lane-mile, and a, b, and r are non-negative parameters. For this function the following results can be proved:
Demand monotonicity for the number of lanes.
Demand monotonicity for the number of ESALs r 0.32.
In this chapter we use a compact form developed for the discrete A-S value [15]. This compact form allows the use of the A-S value in realistic applications with a large number of players, where the computational work becomes excessive without using the form. This section states some fundamental results regarding the demand monotonicity of the log concave characteristic function. The proposed approach [12] is composed of the following three steps.
To separate traffic-related pavement costs into the costs for traffic load and the costs for traffic capacity, the discrete A-S value is used. Suppose that there are m types of players and qi players of a type i. Further, let
and
There are two formulas for the discrete A-S value. A formula by Moulin [11] is shown in (34), where i = 1,…, m:
Another formula by Redekop [16] is given in (35):
The cost per ESAL and the cost per lane are calculated by averaging since all the players of the same type are identical. Thus, the cost per ESAL (Ce) and the cost per lane (Cl) can be calculated as follows, where i = e or l:
There are two types of players, namely, ESALs and lanes. Furthermore, let q1 be the total number of players for ESALs, and q2 be the total number of players for lanes. Then, the cost per lane and the cost per ESAL can be calculated from Redekop’s formula as shown in (37) and (38).
If the cost increment remains the same when t1 (or t2) is fixed and t2 (or t1) is increased by 1 the A-S value can be determined using the simplified compact form formulated in (39).
Since the A-S value satisfies the completeness property, the sum of costs for traffic capacity and traffic load for the grand coalition equals the total cost for that coalition. The sum of ESALs over all vehicle classes is equal to the number of ESALs for the grand coalition (q1), but the sum of the lanes required for each vehicle class is greater than or equal to the lanes required for the grand coalition (q2). Hence, to calculate cost responsibilities for each vehicle class, the number of lanes for the grand coalition should be assigned to the vehicle classes. The Shapley value will be used to determine the number of lanes assigned to vehicle class i (Li). The ith Shapley value for n players is determined using (1), with i = 1, …, n
Costs are allocated to each vehicle class in proportion to the number of ESALs and the number of lanes, that is
where
xi(Ei,Li) : Cost allocated to vehicle class iEi : ESALs for vehicle class i Ce: Cost per ESALLi : Number of lanes assigned to vehicle class i Cl: Cost per lane
5.3. An example
The proposed approach is now illustrated using a simple example. Suppose that there are 3 vehicles: two automobiles (A), one pickup truck (P), and one 5-axle-trailer truck (T). Furthermore, there is 1 base lane, 2 additional lanes, and a total of 4 ESALs. These loads are divided into 1 ESAL for two automobiles, 1 ESALs for one pickup truck, and 2 ESALs for one 5 axle-trailer truck. The numbers of additional lanes required by each vehicle coalition are in shown in Table 2.
{A} | {P} | {T} | {A,P} | {A,T} | {P,T} | {A,P,T} | |
Number of additional lanes | 1 | 1 | 0 | 2 | 2 | 1 | 2 |
The cost in $/mile as a function of the number of ESALs and the number of lanes is assumed to be
A base lane is first included in any possible sequence, and then either E or L is included. The average marginal costs, Ce and Cl, for including E or L in each sequence can be calculated from Table 3. The A-S values (Ce and Cl) can be also calculated by using the formulas shown in Step 1. The calculated values for Ce and Cl are 2.66 and 5.68, respectively.
To calculate number of lanes assigned to each vehicle class by the Shapley value, we first determine the total number of possible sequences as 3! = 6. The average marginal number of lanes, Li, for including A, P, or T in each sequence is calculated from Table 4. The Shapley value for Li can be also calculated by using formulas shown in Step 2.
Inclusion Sequences | |||||||
L | E | E | E | E | L | L | |
2 | L | E | E | E | L | E | L |
3 | L | E | E | E | L | L | E |
4 | L | E | E | L | E | E | L |
5 | L | E | E | L | E | L | E |
6 | L | E | E | L | L | E | E |
7 | L | E | L | E | E | E | L |
8 | L | E | L | E | E | L | E |
9 | L | E | L | E | L | E | E |
10 | L | E | L | L | E | E | E |
11 | L | L | E | E | E | L | E |
12 | L | L | E | E | E | E | L |
13 | L | L | E | E | L | E | E |
14 | L | L | E | L | E | E | E |
15 | L | L | L | E | E | E | E |
Sequences | Including sequences | Marginal number of lanes | ||||
A | P | T | 1 | 1 | 0 | |
2 | A | T | P | 1 | 1 | 0 |
3 | P | A | T | 1 | 1 | 0 |
4 | P | T | A | 1 | 0 | 1 |
5 | T | A | P | 0 | 2 | 0 |
6 | T | P | A | 0 | 1 | 1 |
The Shapley values for the three vehicle classes are:
The cost for the base lane is 2. This cost may be allocated proportionally by ESALs or, perhaps more appropriately, by vehicle miles of travel (VMT), since this cost is a non-load-related cost. Cost responsibilities for the three vehicle classes are shown in Table 5, where the base lane cost has been allocated proportionally according to ESALs.
Vehicle Classes | Load costs ( | Capacity costs ( | Costs for base lane (proportional) | Cost responsibilities |
Automobile | 12.66 | 1.175.68 | 20.50 | 10.30 |
Pickup truck | 12.66 | 0.675.68 | 20.25 | 6.97 |
5-ax-trailer truck | 22.66 | 0.165.68 | 20.25 | 6.73 |
6. Separation of bridge construction and traffic capacity costs
A cost function is needed to estimate the bridge construction cost for the gross vehicle weight associated with any coalition of vehicle classes. This cost function can be developed by determining the cost of the bridge required by a coalition as a percentage of the cost of a baseline bridge. To accommodate all possible coalitions, the range of gross vehicle weight can be divided into an adequate number of intervals or categories. Results for nine categories of gross weight ranging from 5,000 lb to 108,000 lb are shown in Table 6. This table was built using a study by Moses [17] and the 1997 Federal Highway Cost allocation Study [6]. The table shows the required bridge cost for each gross vehicle weight category as a percentage of the cost of a baseline HS20 bridge which has a weight carrying capacity of 72,000 lb. The results for each gross vehicle weight category are the coordinates of one point of the bridge cost function.
Gross VehicleWeight (1000 lb) | 5 | 10 | 20 | 30 | 40 | 54 | 90 | 108 | |
Bridge Cost Percentage | 80.78 | 82.61 | 86.52 | 90.43 | 95.80 | 94.59 | 105 | 110 |
6.1. Bridge cost allocation procedure
The proposed model for the relationship between cost per lane-mile and the gross vehicle weight to be applied is formulated as
where Y is the cost in dollars per lane-mile, li is the number of lanes of bridge type i, X is the gross vehicle weight in kips, and ai and bi are known parameters (to be estimated using regression analysis). Depending on the required number of lanes, more than one cost function can be formulated to determine accurate bridge construction cost estimates. A short-span structured bridge may be proper for a bridge with one lane in each direction, while a longer-span structured bridge may be so for a bridge with more lanes
The bridge construction cost allocation procedure is outlined below [18]. The procedure is essentially the same one developed in Section 5. In the case of bridges, however, there is an additional step (referred to as Step 2 below) to apply the incremental method of highway cost allocation.
This step is identical Step 1 in the methodology described in Section 5 of this chapter.
The cost per unit of weight (Ce) was obtained in Step 1. The traffic-load cost can be allocated to each weight group in vehicle class by using the incremental method, as indicated below:
The lightest vehicle group is first considered. The unit of weight (Ce) is allocated to each vehicle class in this group and all heavier groups according to average daily traffic (ADT).
The next light group is considered. The marginal cost equal to Ce is allocated to each vehicle class in this group and all heavier groups according to ADT.
If the heaviest group is considered, then go to d. Otherwise, continue to b.
If a vehicle class i has several weight groups, then sum up the cost for those weight groups.
Again, this procedure is identical to the Step 2 of the methodology described in Section 5.
This procedure is also identical to the Step 3 of the methodology described in Section 5.
6.2. An example
A simple hypothetical numerical example is presented in this section to illustrate and clarify the application of the proposed method. It is assumed that there are 3 vehicles: automobile {A}, pickup truck {P}, and 5-ax-trailer truck {T}. Also, it is assumed that 1 base lane is required. The number of additional lanes is the same in Table 1. The total vehicle weight is distributed along four intervals: 0-10 kips, 11-20 kips, and 21-30 kips. The percentages of total ADT due to vehicles of each class, for the given weight intervals, are: {A} belongs to the 0-10 kip interval with 65 % of ADT; {P} belongs to the 0-10 kip interval with 20 % of ADT and to the 11-20 kip interval with 5 percent of ADT; {T} belongs to the11-20 kips interval with 5 percent of ADT and to the 21-30 kip interval with 5 percent of ADT. The cost functions for this example are formulated below:
The following results are obtained in each step.
To calculate the A-S value for the cost per unit of weight (10 kips in this example) and the cost per lane the sequences shown in Table 7 can be used. It is noted that the total number of sequences is 5!/(3!2!) = 10. In Table 7 letter K represents one unit of weight (10 kips) and letter L represents one unit of lanes. A gray-shaded column is used for the base lane. A base lane is first included in any possible sequence, and then either a K or an L is included. The average marginal costs (or the A-S value) Ck and Cl can be calculated by using Table 7. The calculated values are Ck = 170/30 = 5.67 and Cl = 150/20 = 7.5.
Sequence | Including Sequence | Marginal Cost | ||||||||||
1 | L | K | K | K | L | L | 1 | 2 | 2 | 2 | 15 | 11 |
2 | L | K | K | L | K | L | 1 | 2 | 2 | 11 | 6 | 11 |
3 | L | K | K | L | L | K | 1 | 2 | 2 | 11 | 8 | 9 |
4 | L | K | L | K | K | L | 1 | 2 | 7 | 6 | 6 | 11 |
5 | L | K | L | K | L | K | 1 | 2 | 7 | 6 | 8 | 9 |
6 | L | K | L | L | K | K | 1 | 2 | 7 | 5 | 9 | 9 |
7 | L | L | K | K | K | L | 1 | 3 | 6 | 6 | 6 | 11 |
8 | L | L | K | K | L | K | 1 | 3 | 6 | 6 | 8 | 9 |
9 | L | L | K | L | K | K | 1 | 3 | 6 | 5 | 9 | 9 |
10 | L | L | L | K | K | K | 1 | 3 | 2 | 9 | 9 | 9 |
See Table 3. LA=1.17, LP=0.67, LT=0.16
The value (cost) of parameter a for the base lane is 2. This cost is allocated proportionally by ADTs in this example. The total cost allocations for the three vehicle classes are shown in Table 8.
Vehicle Classes | Load costs( | Capacity costs( | Costs for base lanes (proportional) | Cost responsibilities |
Automobile | 3.7 | 1.177.5 | 10.65 | 13.12 |
Pickup truck | 3.3 | 0.677.5 | 10.25 | 8.58 |
5-ax-trailer truck | 10 | 0.167.5 | 10.10 | 11.30 |
References
- 1.
Young H P. 1985 Methods and Principles of Cost Allocation In: Young, H P (Eds.), Cost Allocation: Methods, Principles, Applications. Elsevier Science Ltd., North Holland, NY,3 29 - 2.
Dror M. 1990 Cost Allocation: The Traveling Salesman, Binpacking, and the Knapsack. Applied Mathematics and Computation35 191 207 - 3.
Hartman B C. Dror M. 1996 Cost Allocation in Continuous-Review Inventory Models 43 549 561 - 4.
Castano-pardo A. Garcia-diaz A. 1995 Highway Cost Allocation: An Application of the Theory of Nonatomic Games. Part A29 187 203 - 5.
Federal Highway Administration ( U.S. Department of Transportation, Washington, D.C.1982 Final Report on the Federal Highway Cost Allocation Study - 6.
Federal Highway Administration (U S. Department of Transportation) (1997 Federal Highway Cost Allocation Study Final Report. - 7.
Neumann J. Morgenstern O. 1944 Theory of Games and Economic Behavior, Princeton University Press. - 8.
Villarreal-cavazos A. Garcia-diaz A. 1985 Development and Application of New Highway Cost Allocation Procedures. Transportation Research Record1009 34 41 - 9.
Shapley L S. 1953 A Value for n-person Games. In: Kuhn, H.W., Tucker, A.W. (Eds.), Contributions to the Theory of Games, Vol. II, Annual Mathematics Study 28. Princeton University Press, Princeton, NJ,307 317 - 10.
Aumann R J. Shapley L S. 1974 Values of Non-Atomic Games. Princeton University Press, Princeton, NJ. - 11.
Moulin H. 1995 On Additive Methods to Share Joint Costs 46 303 332 - 12.
Lee D. 2002 Game-Theoretic Procedures for Determining Pavement Thickness and Traffic Lane Costs in Highway Cost Allocation Ph. D. Dissertation. College Station, TX: Texas A&M University. - 13.
Friedman E J. 2004 Strong Monotonicity in Surplus Sharing Economic theory.23 643 658 - 14.
Friedman E. Moulin H. 1999 Three Methods to Share Joint Costs or Surplus 87 275 312 - 15.
Lee D. Garcia-diaz A. Lee C. 2012 Demand Monotonicity Analysis of the Discrete Aumann-Shapley Value Based on a Compact Form Used in Highway Cost Allocation” Working Paper. - 16.
Redekop J. 2000 Increasing marginal cost and the monotonicity of Aumann-Shapley pricing. Working Paper, Department of Economics, University of Waterloo, Waterloo, Ontario, Canada. - 17.
Moses F. 1989 Effects on Bridges of Alternative Truck Configurations and Weights, NCHRP Contract No. HR 2-16 (b)m, Transportation Research Board, Washington, D.C. - 18.
Lee D. Garcia-diaz A. Procedure for Bridge Construction Cost Allocation Based on Game Theory In Journal of the Transportation Research Board, No., Transportation Research Board of the National Academies, Washington, D.C.,1996 1996 100 105