TY - CHAP AU - Zhongzhi Fu AU - Shengshui Chen AU - Enyue Ji ED - Hasan Tosun Y1 - 2018-11-05 PY - 2018 T1 - Practices in Constructing High Rockfill Dams on Thick Overburden Layers N2 - Dams and their auxiliary structures are built to provide water for human consumption, irrigating lands, generating hydroelectric power, and use in industrial processes. They are critical structures for continuing life and providing public safety. Construction of a dam is a complicated task that requires sophisticated modern technology and technical expertise. Scientists need to review and adjust their perspectives on designing embankments and their related structures, and compaction and consolidation of fill material, behavior of concrete materials, geotechnical and seismological studies of the dam site, total risk analysis, safety monitoring and instrumentation, heightening, hydrological studies, soil conservation, and watershed management. This book intends to provide the reader with a comprehensive overview of the latest information in dam engineering. BT - Dam Engineering SP - Ch. 1 UR - https://doi.org/10.5772/intechopen.78547 DO - 10.5772/intechopen.78547 SN - 978-1-78985-480-0 PB - IntechOpen CY - Rijeka Y2 - 2024-04-25 ER -