Open access peer-reviewed chapter

Dimensioning of an Autonomous Photovoltaic Installation: Case Study in Msaken, Sousse (Tunisia)

Written By

Olfa Bel Hadj Brahim Kechiche, Marwa Hamza and Habib Sammouda

Submitted: 20 May 2019 Reviewed: 23 July 2019 Published: 25 March 2020

DOI: 10.5772/intechopen.88771

From the Edited Volume

Energy Efficiency and Sustainable Lighting - a Bet for the Future

Edited by Manuel Jesús Hermoso-Orzáez and Alfonso Gago-Calderón

Chapter metrics overview

805 Chapter Downloads

View Full Metrics

Abstract

Renewable energy production has the potential to replace traditional fossil energy and reduce the consumption invoice. In this context, a client wants to realize an autonomous photovoltaic installation for his house that is under construction, located in the city of Msaken, Sousse (Tunisia), in an isolated area of the network of the Tunisian Company of Electricity and Gas (STEG) and will be inhabited by the end of the year 2019. The installation autonomy must be 72 hours in case of bad weather. Therefore, in this chapter, we will determine the technical characteristics of each component of the installation to meet the customer’s energy needs and ultimately provide the total price.

Keywords

  • autonomous PV installation
  • Msaken
  • Sousse (Tunisia)
  • electrical need estimation
  • PV field cost

1. Introduction

Among the major stakes of modern times is the electricity supply, either for domestic consumption (of people) or for industrial consumption [1].

Tunisia is a country in the Middle East that lacks oil reserves. It depends entirely on oil imports from neighboring countries to meet its energy needs. The continued rise in oil prices as a result of increasing world demand and the contraction of oil supply and regional instability put extreme pressure on the Tunisian economy, resulting in difficulties and economic disturbances. The government has responded quickly and actively to overcome the negative effects and deterioration of its economy by gradually reducing its support for consumer prices for electricity and petroleum products.

For more than two decades, Tunisia has focused on the rational use of energy and the development of renewable energies [2, 3]. Ambitious energy demand management programs have reduced the rate of growth of energy consumption and substantially lowered energy intensity. In Tunisia, despite the great efforts and works carried out by the Tunisian Company of Electricity and Gas (STEG), several regions remain unconnected to the public electricity network. For example, outside regions are far from cities. This is a major problem for the inhabitants of these places.

In this context, a client wants to realize an autonomous photovoltaic installation for his house which is under construction, located in the city of Msaken, Sousse (Tunisia), in an isolated area of the network of STEG, and will be inhabited by the end of the year 2019. The installation autonomy must be 72 hours in case of bad weather.

Therefore, an energy efficiency expert is contacted in order to determine the technical characteristics of each component of the installation to meet the customer’s energy needs and ultimately provide the total price.

This chapter is divided into three sections. In the first, we will determine the energy needs of the customer. Then, through the second chapter, we will detail the steps of sizing the solar system and its components. Finally, we will give the total cost of the installation.

Advertisement

2. Electrical need estimation

Estimating the electrical needs consists of calculating the daily electrical energy consumed by the users. Thus, the electrical needs will be expressed in Wh/day (or kWh/day).

The methodology is as follows [4]:

  • First, we have to identify all the electrical devices that will be powered by the autonomous photovoltaic system. For each of these devices, the rated operating power must be identified. So, we can rely on measurements directly on site or the indications on the data sheets/signs of the devices.

  • Then, we will estimate the daily use time.

  • The electrical power product (in W) by the usage time (in h) will indicate the daily energy consumed (in Wh) of the device. In the electricity field, it is customary to use the W and the Wh as measurement units of the power and the electrical energy, respectively.

  • Finally, the sum of the calculated daily energies will give an overall assessment of the building electrical needs.

The power needs and daily energy consumption are reported in Table 1.

DevicesUnit power (W)NumberDuration of use (h)Power (W)Daily energy production (Ec) (kWh/day)
Incandescent lamp75543751.500
Incandescent lamp2521500.050
TV LED210132100.630
Mini fridge1801241804.320
Laptop150121500.300
Laptop charger32160.006
Phone1015100.050
Modem41940.036
Surveillance camera12124120.288
Washing machine250112500.25
Total12477.43

Table 1.

Daily energy consumption.

The previous inventory allows us to draw up a balance of power and energy:

  1. Total power: P=1247W.

  2. Daily consumption: E=7.43kWh/day.

Advertisement

3. Evaluation of the optimal PV module orientation and inclination

Latitude and longitude for Msaken: 35°43′45“ North and 10°34’50” East. This city is located in the northern hemisphere [5].

Optimal inclination angle formula (autonomous PV system) is given by PVGIS Software, and it is equal to 30° [6].

In Tunisia, the best orientation for a photovoltaic field is that of the south. Indeed, it allows capturing a maximum of solar radiation throughout a day and a year.

Solar irradiation represents the energy and the quantity of this energy depending on the exposure of the object or the material that receives it. A horizontal surface does not receive the same amount of solar energy as a vertical one. Thus it is necessary to specify the configuration of the receiver.

The radiation varies along the year, and to project the system, it is necessary to choose which irradiance to consider. Thus, in order to calculate the average value of irradiation received by an optimally oriented and inclined surface, we use PVGIS Software (Figure 1).

Figure 1.

Map of Msaken with coordinates [6].

Assessing the available energy in Msaken area from PVGIS software, the following values are obtained for an optimal inclination of 30° with annual irradiation deficit due to shadowing (horizontal) equal to 0% (Table 2):

MonthHhHoptH(30)Iopt
Jan22103220350057
Feb31104170438050
Mar42905070507038
Apr53305610530023
May6180595053609
Jun6760624054702
Jul6730634056206
Aug63006400591017
Sep48805560546033
Oct37204810498047
Nov25503680397056
Dec19605910318059
Year45105000485030

Table 2.

The calculation results using PVGIS software [6].

Hh: irradiation on horizontal plane (Wh/m2/day); Hopt: irradiation on optimally inclined plane (Wh/m2/day); H(30): irradiation on plane at angle: 30deg. (Wh/m2/day); Iopt: optimal inclination (deg.).

Then in Msaken, the average value of irradiation received by an optimally oriented and inclined surface, noted Ei and calculated using PVGIS Software is about 5kWh/m2/day.

Advertisement

4. Integration of PV modules in the building

The house is under construction, so one of three methods (described in Table 3) can be used for integrating PV modules [7]:

Table 3.

Types of PV panel integration in the building.

Consulting the client, he told us that the PV modules will be arranged using superimposed method.

Advertisement

5. Installation production

5.1 Ratio performance (RP)

The ratio performance (RP) makes possible the quantification of the intrinsic losses of the electrical installation. The performance ratio is, therefore, a number ranging between 0 and 1 (or 0 and 100%) [8].

The RP is specific to each installation. Nevertheless, it is possible to estimate the RP value [9]:

  • The temperature coefficient of the power KT (P) is similar from one module to another (order of magnitude: −0.4%/°C).

  • The voltage drop in the cables is limited to 3%.

  • Regulator output is similar from one regulator to another (97% of order of magnitude).

  • Battery performance is about 85%.

  • The inverter efficiency is similar from one inverter to another (order of magnitude: 95%).

  • Other miscellaneous losses are similar from one facility to another (2% order of magnitude).

The only really variable parameters are the integration mode and the presence or absence of a MPPT device. Thus, we can draw up a general summary table of the RP value (Table 4):

Ratio performance (RP)Modules with very little ventilationModules with little ventilationModules with ventilationModules with well ventilation
Without MPPT0.550.600.650.70
With MPPT0.600.650.700.75

Table 4.

Value of the ratio performance according to the breakdown of the modules.

In our case, PV modules are superimposed. Therefore, it will be considered that this configuration allows the ventilation. In addition, we choose a regulator equipped with a MPPT device: then, the ratio performance is equal to RP=0.7.

5.2 Peak power determination of the PV field

There is a simple analytical formula to estimate the peak power of the PV field, noted as Pc:

Pc=EcEi×PiRPE1

where Pc is the peak power of the photovoltaic field; Ec is the daily electrical energy potentially produced by the photovoltaic system, expressed in kWh/day, in our case Ec=7.43kWh/day; Pi is the illumination power under standard test conditions (STC), expressed in kW/m2. So Pi=1kW/m2; Ei is the daily solar irradiation, expressed in kWh/m2/day, received by the photovoltaic field, in our case Ei=5kWh/m2/day; RP is the performance ratio of the photovoltaic system, in our case RP=0.7.

Then, the peak power of the photovoltaic field Pc is equal to Pc=2.123kWp.

Thus, to ensure customer comfort, we suggest installing a PV array power greater than or equal to 2.123kWp.

Advertisement

6. PV field dimensioning

Figure 2 shows an autonomous photovoltaic installation schematic.

Figure 2.

Schematic of autonomous photovoltaic installation.

6.1 Number of solar modules and characteristics

Following the electrical requirement evaluation and the solar field, here, it is possible to size the photovoltaic field. This operation consists firstly to calculate the installation module number (Eq. (2)) [10]:

N=PcPrE2

where N is the modules number; Pc is the peak power of the photovoltaic field; in our case Pc should be greater than or equal to 2.123kWp; and Pr is the rated power of a PV module.

In the international market, there are several photovoltaic solar module technologies, as described in Figure 3:

Figure 3.

PV technology classes [8].

Due to reduced manufacturing costs and maturity of the technology, crystalline modules are expected to maintain a market share of up to 80% until at least 2017 [8]. Both monocrystalline and multi-crystalline module prices have decreased considerably in the last years.

In this study, the PV module was selected due to few reasons that are worth to mention: its performance, warranty, and high efficiency. Thus, the “Polycrystalline solar panel IBC PolySol 260W (265Wc)” is chosen, so Pr=260W. The datasheet of this module is given in [11].

Then, the installation modules number is equal to N=10.

To size the solar controller, inverter, cables, etc., the following PV characteristic parameters in the Standard Test Conditions (STC) will be used later. We remember that the Standard Test Conditions (STC) are [8]:

  • Cell temperature: θ=25°=T=298.16K

  • Incident radiation: G=1000W/m2

  • Spectral distribution of solar radiation: AM1.5

The electrical characteristics of the PV module in the STC:

  • Rated power: Pmpp=260W.

  • Open-circuit voltage: Voc=38.07V.

  • Maximum voltage: Vmpp=30.57V.

  • Short circuit current: Isc=9.19A.

  • Maximum current: Impp=8.56A

  • Efficiency: η=15.5%

The thermal characteristics of the PV module in the STC:

  • Temperature coefficient: TcPmpp=0.42%/K.

  • Temperature coefficient: TcVoc=0.315%/K.

  • Temperature coefficient: TcIsc=0.04%/K.

6.2 Dimensioning of the solar regulator

The solar regulator is a device that is positioned between the solar modules and the batteries, also known as a charge controller. It is the guarantor of the energy level stored in the batteries [12].

Its main missions are:

  • To convert the output voltage of the solar panel into voltage adapted to the charge of the batteries

  • To protect the batteries by controlling their charge level. Once the batteries are full, the regulator will cut off the park recharge. At the same time, it will stop the power consumption of connected devices if the battery charge level falls below a certain safety threshold (deep discharge limit)

  • To avoid reverse currents and thus protect the panel

The solar regulator is therefore an indispensable control component for the photovoltaic system. It protects the panels and batteries, thus, ensuring the system durability.

Depending on the technologies used, current charge regulators have very good yields, ranging from 85 to 98%.

On the market, there are two technologies of charge controller:

  • PWM (pulse width modulation): This technology makes it possible to modify the voltage of the signal coming from the panels to obtain a signal with a voltage adapted to the charge of the batteries.

  • Maximum power point tracking (MPPT): This technology, which is specific to solar charge controllers, consists of scanning the voltage range across the panel and determining the voltage for which the power produced will be optimal. This allows optimizing the efficiency of the solar panels; the gain in yield is around 10%. However, regulators equipped with MPPT technology are more expensive than conventional regulators.

For most installations, a PWM regulator will be suitable. For large installations with multiple panels, MPPT regulators will be preferred. In our case, we use a MPPT regulator.

The solar regulator dimensioning is carried out according to three major parameters:

  • Current compatibility

  • Voltage compatibility

  • Power compatibility

In this study, we choose Victron energy BlueSolar charge MPPT 150/100 as a solar regulator. Thus, we will have to check the compatibility of this regulator with this installation based on its datasheet [13] (Figure 4):

  • Current compatibility: The PV module short circuit current is equal to Isc=9.19A under the STC conditions. The safety factor 1.25 should be applied to the Isc, so, 1.25×9.19=11.48A.

    Thus, in order to not exceed the regulator maximum current 30 A, the maximum number of PV strings to be paralleled is 100/11.48=8.7. Therefore, with this regulator, we will be able to wire 5 strings in parallel.

  • Voltage compatibility: If we use 5 strings in parallel, then each string will consist of 2 modules in series. In this case, the open circuit voltage of the string VocT is 38.07V×2=76.14Vunder STC conditions.

    A coefficient of 20% is added to this value to account for the ambient temperature influence, 76.14×1.2=91.368V. According to the regulator datasheet, the regulator input voltage must not exceed 150 V. Therefore, the use of 2 modules in series validates this condition.

  • Power compatibility: The photovoltaic module rated power (8 modules) is equal to: PmppTmodules=10×Pmpp=10×260W=2600W. We identify, in Figure 4, that the rated power of the MPPT regulator is PmppT24V=2900WPmppTregulatorPmppTmodules.

Figure 4.

Victron energy ‘BlueSolar charge MPPT 150/100’ datasheet.

Figure 5 shows the photovoltaic module association (5 strings, each string is composed by 2 modules in series).

Figure 5.

Photovoltaic modules association.

6.3 Battery dimensioning

The battery capacity must be able to cover all the electrical needs (Ec).

When we size the batteries’ capacity, we apply the following dimensioning rule [12, 14]:

  • Over the duration of the reserve autonomy (NJ)

  • Without any solar energy contribution

  • Without ever exceeding the maximum depth of discharge (PD)

6.3.1 Reserve autonomy

We define the notion of reserve autonomy which corresponds to the desired day’s number during which the batteries are able to supply, without any additional contribution from the photovoltaic field, all the electrical needs. We note NJ the day’s number of reserve autonomy. The choice of NJ depends on the climatic conditions of the site and more particularly the number of consecutive days without sunshine. Usually, in Tunisia, NJ is fixed on 3 days.

6.3.2 Maximum depth of discharge

Repetition of deep discharges of the batteries should be avoided. Indeed, a too deep discharge tends to produce lead sulfate which agglomerates at the level of the electrodes. This phenomenon develops during the charging/discharging cycles and amplifies all the more as the discharge is deep. Eventually, an insulating layer of lead sulfate appears and prevents chemical reactions from occurring. Then, the accumulator becomes unusable, or at least it is able to fall dramatically.

We note PD the maximum discharge depth of a battery.

In this study, we chose “SOLAR ASSAD” as solar battery, 12 V, capacityCb=230Ah. Thus, we will have to check the necessary batteries number and serial or parallel association based on its datasheet [15] (Figure 6).

Figure 6.

SOLAR ASSAD battery datasheet.

The battery capacity CT is calculated using the following expression:

CTAh=Ec×NJ/PD×UTE3

where NJ is the number of days with insufficient sunshine (in our case NJ=3days); Ec is the daily electrical energy potentially produced by the photovoltaic system expressed in kWh/day, in our case Ec=7.43kWh/day;UT is the voltage in volt under which the battery is installed (12 V, 24 V, 48 V); in our case, 2 battery chains will be installed ➔ UT=24V; and PD is the maximum discharge depth of the batteries. In practice, a maximum depth of discharge of 70% is chosen.

Then, the battery capacity CT is equal to CT=1327Ah.

When we size the capacity of the batteries, we can calculate the battery number Nb to be paralleled:

Nb=CTCbE4

where CT is the batteries capacity, CT=1327Ah; and Cb is the battery capacity, according to Figure 5, Cb=230Ah.

Then, the battery number to be paralleled is equal to Nb=6.

So the total battery number is equal to NbT=12: 2 battery chains (to obtain 24 V) on 6 parallel (to obtain capacity of 1327 Ah) (Figure 7).

Figure 7.

Batteries association.

6.4 Autonomous or off-grid inverter dimensioning

The off-grid inverter is the essential electronic device that converts DC low voltage from a battery or other power source to 100120 V or 220–240 V AC voltage. Off-grid inverter produces a voltage wave, with an independent frequency from the grid. Not only does the inverter convert DC to AC power, but it may also regulate the PV system if correctly dimensioned according to the battery voltage levels [12, 14].

Table 5 summarizes the recommended international standards for inverters intended for photovoltaic applications. Each country adapts them to the specificities of national functioning and regulation. Manufacturers are therefore slightly modifying the final design of their products to meet the requirements of each country [16].

Table 5.

A summary of typical international codes and standards for PV applications.

In our case, the solar inverter is used to convert a 24 V battery DC voltage into 230 V AC voltage identical to that of the building electricity grid.

The off-grid inverter choice is based on three criteria:

  • Part DC: On the DC side, the inverter must be adapted to the system voltage imposed by the battery bank. In our case, the battery output voltage is equal to 24 V.

  • Part AC: On the AC side, the inverter will impose an output signal adapted to the devices it feeds. In our case, the frequency voltage is equal to 50 Hz, and the effective voltage value is equal to 230 V.

  • Rated power: The inverter rated power should cover the sum of the all user powers. A sizing margin of 20–30% is recommended to ensure that the inverter operates at an ambient temperature of 25°C. In this study, the user powers are equal to 2123Wp, so the inverter rated power should be greater than 2123×1.3=2760W.

In this study, we chose P3000–482 Off-grid DC to AC pure sine wave 24 V–220 V solar inverter (Figure 8). Thus, we will have to check the compatibility of this inverter with this installation based on its datasheet [17] (Figure 9):

Figure 8.

P3000-482 Off-grid DC to AC pure sine wave 24–220 V solar inverter.

Figure 9.

Solar inverter datasheet [17].

In the next study, it is necessary to:

  • Determine the cables sections that cause the least possible drop in voltage between the modules and battery-regulator-inverter and also between the inverter and loads.

  • Dimension the protection components such as fuses, switch, etc.

6.5 Dimensioning of the DC and AC cable

6.5.1 DC cable

The solar cables must comply with several regulatory constraints summarized in the guide of the ETU C32–502 [18, 19].

These are specific cables subject to particular operating conditions. They must be designed to operate with ambient temperatures between −35 and +70°C.

Thus, it is expected that:

  • The maximum permissible core temperature at steady state is 90°C.

  • The maximum permissible core temperature in the overload condition is 120°C.

The cable section choice of the installation is made according to two major criteria:

  • Tolerated voltage drop

  • The maximum current allowed in the cables

6.5.2 Determination of the conductor section between the panels and the regulator

The conductors section between the panels and the regulator can be calculated using (Eq. (5)):

S=ρ×LRmaxE5

where

  1. ρ is the substance conductivity:

    Copper: ρcopper=1.7×108Ωm

    Aluminum: ρAluminum=2.8×108Ω.m

    Both values are calculated at 27°C. At higher temperatures, the material resistance increases and the conductivity decreases.

    In our case, the used conductors are copper.

  2. The distance between the solar PV panels and the regulator is L=16m (outgoing and incoming cable).

  3. The UTE C15-712 guide for PV installations indicates that the DC voltage drop must be less than 3% and ideally 1%. In our case, it’s fixed at σ=1%. Then, at a current of IscT=9.19×5=45.95A, the maximum resistance of the cable can be calculated using (Eq. (6)):

Rmax=VocT×σIscT=38.07×2×0.0145.95Rmax=0.0165ΩE6

Then, the conductor section is equal to:

S=ρ×LRmax=1.7×108×160.0165=16.48mm2

A cable cross-section of 16 mm2 is sufficient to maintain the loss below 1%.

6.5.3 Determination of the conductor section between the regulator and the batteries

Calculating the output current of a panels at its rated power:

I=PcUT=260024I=108.33AE7

The distance between the regulator and the batteries is L=3m (outgoing and incoming cable).

Then the conductor section is equal to:

S=ρ×L×Iσ×UT=1.7×108×3×108.330.01×24=23mm2

A cable cross-section of 25 mm2 is sufficient to maintain the loss below 1%.

6.5.4 AC cable

The AC cable section formula is as follows:

S=ρ×b×L×Ibε×VnE8

where S is the conductors section (m2); b is the coefficient which is 1 in three-phase and 2 in single-phase; Vn is the nominal voltage: Vn=230V in single-phase or Vn=380V in three-phase; Ib is the maximum current; Ib=PcVn=2123230I=9.23A; ρ is the material resistivity (Ω m); in our case, the used conductors are copper; and L is the conductor length (m). The distance between the inverter and the loads is 30m; ε is the AC voltage drop; and in our case, it’s fixed at 1%.

Then,

S=1.7×108×2×30×9.230.01×230=4.09mm2

AC cable cross-section of 6 mm2 is sufficient to maintain the loss below 1%.

To validate this calculation, we can use “SigmaTec” which is an online calculator of cable sections [20]. Figure 10 shows an example of calculation.

Figure 10.

The calculation results using “Sigma Tec” online calculator.

6.6 Dimensioning of DC protection components

Every PV installation requires an AC protection box and a DC protection box. These AC/DC electrical boxes protect the photovoltaic system on the DC part as well as on the AC part.

The protection component characteristics will be chosen based on the following standards and guides [18, 19]:

Standards:

  1. IEC 60364–7-712: Rules for installations and locations special—photovoltaic power supplies

  2. Solar (PV) NF C 15–100: Low-voltage electrical installations and regulations

Guides:

  1. Guide UTE C 15–712-1: Practical guide, installation of solar photovoltaic (PV) generators.

  2. UTEC guide 61,740–51 (2009): It concerns the tests of surge arresters for DC application only. These tests are based on AC surge arrester standards but differentiate for “end of life tests.”

6.6.1 DC fuses

According to the UTE C15–712-1, the presence of fuse is always obligatory for each of the photovoltaic chains, in order to protect the photovoltaic modules and the cables of the currents being able to flow from the park of batteries toward the panels (in particular in the dark period when the battery is able to discharge through the photovoltaic field), in the case where the regulator’s nonreturn device is inoperative.

In our case, we need five fuses on each of the two extremities of PV panels (Figure 11).

Figure 11.

Fuses location in the PV system.

6.6.1.1 Calibration of fuses

On the DC side, overcurrent occurs as back current. Above certain intensity, the return currents can damage the photovoltaic modules.

In general, photovoltaic modules can support a maximum return current that depends on the number of branches in parallel presented in Table 6:

Number of parallel chainMaximum value of the return current in a chain
Nc = 10
Nc = 21.25 × Isc
Nc = 32 × 1.25 × Isc
Nc ≥ 1(Nc−1) × 1.25 × Isc

Table 6.

Fuses choice.

The use of fuses also allows the shutdown of a single photovoltaic chain in the event of maintenance activities, thus avoiding the shutdown of the entire installation.

The rated current IN of the fuses must, in accordance with the guide of the UTE C15 712-1, comply with the following condition, (Eq. (9)):

1.1×Isc,max1.25×IscINIRM2×IscE9

with IN being the rated current of the fuse or rated current of the fuse and IRM being the maximum return current that can support a module without being damaged

Then,1.1×1.25×IscIN2×Isc1.1×1.25×9.19IN2×9.1912.6362AIN18.38A

In addition, the fuses used must have the following characteristics:

  • Being specific to a DC application

  • “Fast-melting”

  • Being independent of the flow direction

  • Having the gPV mark

By consulting the marketed product catalogs, the choice was set for gPV fuses of 15 A caliber and 50 kA breaking capacities. Table 7 shows the fuse characteristics [21]:

Number2
Rated current15 A
Rated voltageDC 1000 V
Breaking capacity50 kA

Table 7.

Fuse characteristics.

6.6.2 DC lightning protection

A lightning protection is required to protect the installations from high transient voltages. Placed between the fuse of the panels and the batteries, it will be connected to the ground in order to evacuate the lightning potentially attracted by the metallic structure of the modules (itself connected to the ground) [22].

Lightning protection can contain different internal components such as spark gaps or clipping diodes. These components are intended to quickly limit the voltages appearing at their terminals.

The choice between type 1 and type 2 lightning protections is determined from Table 8.

Installation characteristicsNK ≤ 25NK ≥ 25
DC sideAC sideDC sideAC side
Building or structure equipped with a lightning rodType 2Type 1Type 2Type 1
Medium voltage supply by a line wholly or partly overheadType 2Type 2Type 2Type 2
Medium voltage supply via a completely underground lineType 2Type 2Type 2Type 2

Table 8.

Lightning protection type choice [23].

The keraunic level of a site NK defines the number of thunderstorms per year in a given place. It is determined by the map given by the weather Tunisia [23].

The Sousse keraunic level equals to 47, so in our case, NK25; and so, the type of surge arrester is type 2.

  • The recommended minimum discharge current In is 5 kA. A higher value will give a longer life.

  • The voltage Uc of a lightning protection must be greater than or equal to 1.2×Vocof PV generator; we obtain Uc1.2×38.07=45.68V.

Table 9 shows the following lightning protection characteristics.

Type2
Rated voltageDC 1000 V
Nominal discharge current In (8/20) μs15 kA
Maximum discharge current I total (8/20) μs20 kA

Table 9.

Lightning protection characteristic.

6.6.3 DC switch disconnector

An electrical distribution from solar energy requires the same protections as for a conventional network. However, the DC side protections are special because direct current is difficult to interrupt if an arc occurs.

In a photovoltaic installation, it is essential to be able to cut off the power, for example, to carry out maintenance operations.

The switch disconnector choice must take into account the following criteria:

In5×1.25×IscIn57.43AUe2×VocUe76.14V

where In is the rated current of the switch disconnector (A) and Ue is the rated voltage of the switch disconnector (V).

6.7 Dimensioning of AC protection components

6.7.1 AC switch disconnector

The voltage at the inverter output is 230 V. In fact, the disconnector voltage must be better than:

Ve230×1.14=262.2V

The inverter output current is equal to 10A. So the disconnector current is given by:

In1.25×10=12.5A

Table 10 shows the characteristics of the switch disconnector.

Rated voltage230/400VAC-50 Hz
Rated current15 A

Table 10.

Switch disconnector characteristic.

6.7.2 Differential circuit breaker

The electrical installation is generally considered the occurrence seat of abnormally high currents such as short circuit, overload, and indirect contacts. To guard against the pervious defects, it is preferable to install a differential circuit breaker to cut the installation if necessary. On the AC side of a photovoltaic installation, a differential magnetothermic circuit breaker upstream of each inverter must be installed.

6.7.3 AC lightning protection

On the AC side of a photovoltaic installation, we will install a lightning protection in order to protect the entire installation.

Advertisement

7. Results and discussion

This study throws light on the following points:

  1. In Msaken, the solar irradiation varies between a minimum of 3.22 kWh/m2/day and a maximum of 6.4 kWh/m2/day, while mean value remained as 5 kWh/m2/day.

  2. The energy need of the customer was identified at 7.43 kWh/day which corresponds to a photovoltaic field peak power Pc equal to Pc=2.123kWp.

  3. The proposed solution is to install 10 PV modules of total power 2600 W, while the necessary power is 2123Wp. Thus, the customer can supply another electrical device without the need to modify the PV installation.

  4. It is recommended to improve the energy efficiency of the building by studying the characteristics of each load and by proposing to the customer to replace the existing loads by others that are more economic.

7.1 Cost analysis

The PV field installation cost is reported in Table 11.

ComponentsQuantityUnit price (Euro)Total price (Euro)
Solar panel polycrystalline IBC PolySol 260 W102532530
Victron energy e BlueSolar charge MPPT 150/1001816816
Solar battery ASSAD12202,6172431,404
P3000-482 Off-grid DC to AC pure sine wave 24–220 V1305305
Differential circuit breaker12626
AC/DC lightning protection288.96177.92
DC fuses51272
AC switch disconnector13636
DC switch disconnector1170170
DC cables 25 mm23 m9.929.7
DC cables 16 mm216 m2.641.6
AC cables 6 mm230 m1.3239.6
Structure530150
Maintenance and operational costs (Euro/year)31.5
Total6856.724

Table 11.

PV field installation cost.

Advertisement

8. Conclusion and prospects

The objective of this chapter was to design and present a photovoltaic system, in the form of an autonomous power supply system for a future house located in an isolated area in Msaken, Sousse (Tunisia). An energy need analysis of the customer was carried out in order to properly size the various components of the installation.

The autonomous system presented in this chapter leads to a continuous lighting supply of the load for 72 hours. In comparison, a system connected to the network in Tunisia would lead to occasional power outages, affecting the entire installation.

To obtain a robust solar system, the photovoltaic panels must be supplemented by a charge controller, a group of batteries, and an inverter. The recommended panel assembly consists of 10 polycrystalline 260 W photovoltaic modules. The installation must be installed at an angle of 30° south. A charge controller regulates the charge of 12 batteries “SOLAR ASSAD” of 230 Ah. An inverter is used to supply loads with alternating current. The total investment cost of the system is 6856.724Euro.

Although the results obtained in the calculations can be considered valid, some improvements can be made to the calculation method to obtain more accurate results. Thus, as short-term prospects, it will be necessary to:

  • Obtain more accurate meteorological data for optimized sizing of plant components.

  • Reconfigure the PV modules taking into account the optimal spacing between the rows, and optimize the shading losses.

  • Validate the sizing performed using specific software such as PVsyst and Archelios™.

  • Study in more detail the future requirements of the customer such as external lighting systems with auxiliary energy saving and efficiency systems such as LEDs, voltage stabilizers, etc., and calculate whether the PV system designed meets these requirements.

  • Conduct a more in-depth study on the costs associated with the PV installation analyzed. Try to obtain the cost of the components/services of a photovoltaic project located in Tunisia.

  • Include an environmental analysis of the PV project.

  • Try to apply the calculation method developed with other photovoltaic modules, regulators, batteries, and inverters, with a different tracking system or located on another site, and check if the results are consistent with the results previously obtained.

Advertisement

Acknowledgments

This project was supported by the Tunisian Ministry of Higher Education and Scientific Research under Grant LabEM—ESSTHSousse—LR11ES34.

Likewise, the authors would like to thank SOS ENERGY Company for the technical information.

Advertisement

Conflict of interest

The authors declare no conflict of interest.

References

  1. 1. Balghouthi M, Trabelsi SE, Ben Amara M, Ali ABH, Guizani A. Potential of concentrating solar power (CSP) technology in Tunisia and the possibility of interconnection with Europe. Renewable and Sustainable Energy Reviews. 2016;56:1227-1248
  2. 2. El Haddad M. Development of renewable energies in Tunisia. Renewable Energies, National Agency. 2017;October:1-2
  3. 3. Rocher L. Energy transition and revolution in Tunisia: Politics and spatiality. Arab World Geographer. 2013;16(June) 277–xx
  4. 4. Aide I. Support Electrique pour Installation Solaire. 2012. Available from: http://www.interaide.org/pratiques/sites/default/files/support_electrique_pour_installation_solaire.pdf [Accessed: 02 June 2019]
  5. 5. Coordonnées géographiques et cartographie Msaken-Tunisia. Available from: https://www.horlogeparlante.com/coordonn%C3%A9es-g%C3%A9ographiques-2469140.html [Accessed: 16 July 2019]
  6. 6. PVGIS Climate-SAF database. Institute for Energy and Transport (IET), 2001–2012. Available from: https://re.jrc.ec.europa.eu/pvgis/apps4/pvest.php?map=africa&lang=fr [Accessed: 16 July 2019]
  7. 7. Benemann J, Chehab O, Schaar-Gabriel E. Building-integrated PV modules. Solar Energy Materials & Solar Cells. 2001;67(1–4):345-354
  8. 8. International Finance Corporation (IFC) World Bank. Utility-scale solar photovoltaic power plants: A projects developer’s guide. In: World Bank Group. 2015. p. 216
  9. 9. van Sark WGJHM, Reich BMNH. Review of PV performance ratio development. World Renewable Energy Forum, WREF. 2012;6:2012
  10. 10. Master’s degree in energy engineering design and modelling of a large-scale PV plant Escola Tècnica superior d’Enginyeria Industrial de Barcelona [M. thesis]. June 2018
  11. 11. Polycrystalline solar panel IBC PolySol. Available from: https://www.solaris-store.com/1307-panneau-solaire-ibc-polysol-260w.html [Accessed: 12 April 2019]
  12. 12. Carriço J. Technical and economic assessment of a 500 W autonomous photovoltaic system with LiFePO4 battery storage. November 2015
  13. 13. Contrôleurs de charge BlueSolar charge avec visou connexion PV MC4. Available from: https://k8s-ecolosun-production.s3.eu-west-3.amazonaws.com/documents/files/2757/original/Fiche technique régulateur solaire MPPT Victron-150-45-à-150-100.pdf?1474898697 [Accessed: 02 July 2019]
  14. 14. Alkhalidi AAT. Design of an off-grid solar PV system for a rural shelter. School of Natural Resources Engineering and Management, Department of Energy Engineering Design of an Off-Grid Solar PV system for a rural shelter. Presented by Noor Hussain Al Dulaimi – 2008203032 F. January 2018
  15. 15. Fiche batterie Solaire Assad. Available from: http://www.solar-power-company.com/article/pdf/FICHE-batterie-SOLAIRE-Assad.pdf. [Accessed: 02 July 2019]
  16. 16. Kouro S, Leon JI, Vinnikov D, Franquelo LG. Grid-connected photovoltaic systems: An overview of recent research and emerging PV converter technology. IEEE Industrial Electronics Magazine. 2015;9(1):47-61
  17. 17. Solar inverter datasheet. Available from: https://www.aliexpress.com/item/P3000-482-Off-grid-dc-to-ac-pure-sine-wave-48v-220v-solar-inverter-3000w-voltage/32766770825.html [Accessed: 12 April 2019]
  18. 18. C.-712 UTE. Installations photovoltaïques raccordées au réseau public de distribution. Ed. Diffus. par l’Union Tech. l’Electricité; 2008
  19. 19. C.-712-1 UTE. Installations photovoltaïques raccordées au réseau public de distribution. Ed. Diffus. par l’Union Tech. l’Electricité; 2010
  20. 20. Online Calculator of Cable Sections. Available from: http://www.sigma-tec.fr/textes/texte_cables.html
  21. 21. Fuse-links & fuse holders. Available from: http://solarge.tw/prod-info/prod-04/PMX_en.pdf [Accessed: 02 July 2019]
  22. 22. Installations photovoltaïques raccordées au réseau public de distribution DIMENSIONNEMENT CORRIGE Composants DC et AC. Available from: https://energypedia.info/images/a/ab/Dimensionnement_Sujet_composant_DC_et_AC.pdf. pp. 1-34. [Accessed: 12 July 2019]
  23. 23. La sécurité des installations photovoltaïques. 2016. Available from: https://energypedia.info/images/4/4c/Sécurité_des_IPV-STEG-v2.pdf. [Accessed: 08 July 2019]

Written By

Olfa Bel Hadj Brahim Kechiche, Marwa Hamza and Habib Sammouda

Submitted: 20 May 2019 Reviewed: 23 July 2019 Published: 25 March 2020